Subsequent building works

As your Asbestos Management Plan should state, over and above the current Management Level asbestos survey, as soon as any refurbishment or demolition works come into view, then a Refurbishment / Demolition level asbestos survey must be carried out and all discovered asbestos has to be removed prior to the rest of the works commencing.  Regulations 5 and 6 of the Control of Asbestos Regulations 2012 refer.

Please note :  Only the areas to be refurbished / demolished (together with further areas where piping and wiring will be affected), need to be surveyed here ~ not necessarily, the whole building (if other parts are unaffected).

Asbestos Crawley

Fire damage

Fire damaged areas must be surveyed to the Refurbishment / Demolition level before re-instatement can commence.